Clinton War Work Weekend

From An Tir Culture Wiki
Revision as of 20:22, 7 December 2025 by Archibald the Red (talk | contribs) (Creation of page. Requires more info.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The Clinton War work weekend was held the weekend before Clinton War, where people would show up to help get the site ready for the event. During the week between, people would also help get the site ready for the event.

The work was mainly clearing brush, maintaining the water supply, maintaining existing structures like the biffies, bakehouse and showers, and in later years constructing castles.

Three castles have been present on site. From the recollection of Finnr: "The first castle was an old small barn way up the back end of the property just before the bat galleries. The second castle was built down on the war field far to right side of the existing castle if you are facing it's front. I think we rebuilt it at least once. The third and existing Castle was built by a lot of people and driven by Geoffrey MacLean. We also had engineer week back then and it still comes and goes which was a more specific and focused kind of work week."

Thank you to Finnr for providing information!